MGT 322MGT 322 Chapter 12 Chapter 12 Problem 2 - The following table lists the components needed to assemble an end item, lead times, and quantities on hand. Item End B C D E F G H LT Week ... 1 2 3 3 1 2 1 2 Amount on hand 0 10 10 25 12 30 5 0 a - If 20 units of the end item are to be assembled, how many additional units of E are needed? E is needed in other components (B, C, and D). End unit needs 2 B’s = 20 units to be made * 2 = 40 – 10 on hand units = 30 B needs 2 units of E = 30 units * 2 = 60 – 12 on-hand = 48 End unit requires 1 unit of C = 20 units to be made * 1 = 20 – 10 on hand = 10 C needs 2 units of E = 10 units * 2 = 20 End unit needs 3 D’s = 20 units to be made * 3 = 60 – 25 = 35 D needs 2 units of E = 35 * 2 = 70 48 + 20 + 70 = 138 b - An order for the end item is scheduled to be shipped at the start of week 11. What is the latest week that the order can be started and still be ready to ship on time? There are three sections that need to be finished in order for the end item to be complete i.e. (1) B, E, and F (2) C, G, and E, (3) D, H, and E. Lead times are as follows: (1) B = 2 weeks, E = 1 week, and F = 2 week, which is a total of 5 weeks (2) C = 3 weeks, G = 1 week, and E = 1 week, which is a total of 5 weeks (3) D = 3 weeks, H = 2 weeks, and E = 1 week, which is a total of 6 weeks Week 11 – 6 week lead time = 5 3 – The following table lists the components needed to assemble an end item, lead times (in weeks), and quantities on hand. a - If 40 units of the end item are to be assembled, how many additional units of B are needed?
 End unit needs 2 L’s = 40 * 2 = 80 – 10 on hand = 70 L needs 2 units of B = 70 * 2 = 140 – 30 on hand = 110 End unit needs 1 C = 40 * 1 = 40 – 15 on hand = 25 C needs 2 units of B = 25 * 2 = 50 End unit needs three K’s = 40 * 3 = 120 – 20 on hand = 100 K needs 2 units of B = 100 * 2 = 200 110 + 50 + 200 = 360 b - An order for the end item is scheduled to be shipped at the start of week 8. What is the latest week that the order can be started and still be ready to ship on time? There are three sections that need to be finished in order for the end item to be complete i.e. (1) L, B, and J (2) C, G, and B, (3) K, H, and B. Lead times are as follows: (1) L = 2 weeks, B = 2 weeks, and J = 3 weeks, which is a total of 7 weeks (2) C = 3 weeks, G = 3 weeks, and B = 2 weeks, which is a total of 8 weeks (3) K = 3 weeks, H = 2 weeks, and B = 2 weeks, which is a total of 7 weeks [Show More]

Last updated: 1 year ago

Preview 1 out of 3 pages

Add to cart

Instant download

document-preview

Buy this document to get the full access instantly

Instant Download Access after purchase

Add to cart

Instant download

Reviews( 0 )

$9.00

Add to cart

Instant download

Can't find what you want? Try our AI powered Search

OR

REQUEST DOCUMENT
90
0

Document information


Connected school, study & course


About the document


Uploaded On

Sep 19, 2020

Number of pages

3

Written in

Seller


seller-icon
QuizMaster

Member since 4 years

1091 Documents Sold


Additional information

This document has been written for:

Uploaded

Sep 19, 2020

Downloads

 0

Views

 90

Document Keyword Tags

What is Browsegrades

In Browsegrades, a student can earn by offering help to other student. Students can help other students with materials by upploading their notes and earn money.

We are here to help

We're available through e-mail, Twitter, Facebook, and live chat.
 FAQ
 Questions? Leave a message!

Follow us on
 Twitter

Copyright © Browsegrades · High quality services·