ACQ Intermediate Systems Acquisition > QUESTIONS & ANSWERS > Intermediate Systems Acquisitions (ACQ 202) (All)

Intermediate Systems Acquisitions (ACQ 202)

Document Content and Description Below

LORA Correct Answer: Level of Repair Analysis: LORA will ensure that operational readiness is achieved throughout a system's life cycle in an optimal, least cost fashion. Starting the LORA proce... ss early in a system's development, and continuous evaluation throughout its life cycle, can ensure LORA influences the systems design and the maintenance planning by producing an effective support solution. LORA considers: Correct Answer: Cost, performance, schedule, and supportability to aid in finalizing an effective and supportable design solution. FTA Correct Answer: Fault Tree Analysis: Involves using deductive logic to determine the possible causes of a defined undesired operational result. It is a top- down failure analysis of a system that analyzes a series of lower-level events. RCM Correct Answer: Reliability Centered Maintenance (RCM): consists of a systematic approach of analyzing system/equipment reliability and system safety data to determine the feasibility and desirability of preventive maintenance activities, to highlight maintenance problem areas for design review consideration, and to establish the most effective preventative maintenance program for a system/equipment. Level of repair Analysis (LORA) Correct Answer: The objectives of performing a LORA is to ensure that operational readiness is achieved throughout a system's life cycle in an optimal, least cost fashion. Starting the LORA process early in a system's development, and continuous evaluation throughout its life cycle, can ensure a LORA influences the systems design and the maintenance planning by producing an effective support solution. MTA Correct Answer: Maintenance Task Analysis (MTA): The identification of the steps, spares and materials, tools, support equipment, personnel skill levels as well as any facility issues that must be considered for a given repair task. Also include in the MTA are elapsed times required for the performance of each task. The Four Prime factors that govern system acquisition programs are: Correct Answer: Cost, schedule, performance, and supportability. [Show More]

Last updated: 1 year ago

Preview 1 out of 9 pages

Reviews( 0 )

$5.00

Add to cart

Instant download

Can't find what you want? Try our AI powered Search

OR

GET ASSIGNMENT HELP
40
0

Document information


Connected school, study & course


About the document


Uploaded On

Nov 10, 2022

Number of pages

9

Written in

Seller


seller-icon
ETSY

Member since 1 year

6 Documents Sold


Additional information

This document has been written for:

Uploaded

Nov 10, 2022

Downloads

 0

Views

 40

Document Keyword Tags

Recommended For You

What is Browsegrades

In Browsegrades, a student can earn by offering help to other student. Students can help other students with materials by upploading their notes and earn money.

We are here to help

We're available through e-mail, Twitter, Facebook, and live chat.
 FAQ
 Questions? Leave a message!

Follow us on
 Twitter

Copyright © Browsegrades · High quality services·