Architecture > QUESTIONS & ANSWERS > 319690244_problems_audit_of_property_plant_and_equipment_docx.pdf.pdf | Download for quality grades  (All)

319690244_problems_audit_of_property_plant_and_equipment_docx.pdf.pdf | Download for quality grades |

Document Content and Description Below

PROBLEM 1: The following independent situations relate to the acquisition/self construct of various property, plant, and equipment items. Answer the question/s at the end of each situation 1. BRAD... PIT, INC. has constructed a production equipment needed for the company’s expansion program. Bradpit received a P1,500,000 bid from a reputable manufacturer for the construction of the equipment. The costs of direct material and direct labor incurred to construct the equipment were P960,000 and P600,000, respectively. It is estimated that incremental overhead costs for construction amount to 140% of direct labor costs. Fixed costs (excluding interest) of P2,100,100 were incurred during the construction period. This amount was allocated to construction on the basis of total prime costs – the sum of direct labor and direct material. The prime costs incurred to construct the new equipment amounted to 35% of the total prime costs incurred for the period. The company’s policy is to capitalize all possible costs on self construction projects. To assists in financing the construction of the production equipment, Bradpit borrowed P1.5 million at the beginning of the 6-month construction period. The loan was for 2 years with interest at 10% What is the total cost of the self-constructed equipment? A. P3,210,000 C. P3,021,000 B. P2,610,000 D. P3,285,000 2. The following transactions relate to IMPO COMPANY  The national government grants the company a large tract of land to be used as a plant site. The land’s fair value is determined to be P1,620,000.  Impo Company issued 280,000 ordinary shares (par valu, P50) in exchange for land and building. The fair value of the property is determined to be P16,200,000 with the following allocation: Land P3,600,000 Building 12,600,000 P16,200,00 [Show More]

Last updated: 1 year ago

Preview 1 out of 32 pages

Add to cart

Instant download

We Accept:

We Accept
document-preview

Buy this document to get the full access instantly

Instant Download Access after purchase

Add to cart

Instant download

We Accept:

We Accept

Reviews( 0 )

$13.00

Add to cart

We Accept:

We Accept

Instant download

Can't find what you want? Try our AI powered Search

OR

REQUEST DOCUMENT
58
0

Document information


Connected school, study & course


About the document


Uploaded On

Mar 17, 2023

Number of pages

32

Written in

Seller


seller-icon
Wanjiku

Member since 1 year

0 Documents Sold


Additional information

This document has been written for:

Uploaded

Mar 17, 2023

Downloads

 0

Views

 58

Document Keyword Tags


$13.00
What is Browsegrades

In Browsegrades, a student can earn by offering help to other student. Students can help other students with materials by upploading their notes and earn money.

We are here to help

We're available through e-mail, Twitter, Facebook, and live chat.
 FAQ
 Questions? Leave a message!

Follow us on
 Twitter

Copyright © Browsegrades · High quality services·