Management > EXAM > SAFe 4 Advanced Scrum Master (4.5) PRACTICE TEAM (70% Passing) (All)
Which statement is true about the phase-gate milestone model and risk reduction? Answer is 'A' A. It does not mitigate risk as intended B. It creates large batches of requirements C. It reduces pr... oduct increment values D. It helps to visualize and limit WIP When does the Inspect and Adapt event happen? Answer is 'D' A. At the end of the System Demo B. At the end of every two weeks C. At the end of the second day of PI Planning D. At the end of each PI Who reviews the top capabilities for the upcoming PI? Answer is 'C' A. Project Manager B. Solution Architect/Engineer C. Solution Management D. Project Owner Why should team members continuously and actively engage with other teams during PI Planning? Answer is 'C' A.To manage dependencies and resolve impediments B. To understand how the other team is working C. To foster an environment of capacity and velocity D. To create a backlog of features the team can adopt [Show More]
Last updated: 1 year ago
Preview 1 out of 17 pages
Instant download
Instant download
Connected school, study & course
About the document
Uploaded On
Apr 11, 2023
Number of pages
17
Written in
This document has been written for:
Uploaded
Apr 11, 2023
Downloads
0
Views
36
In Browsegrades, a student can earn by offering help to other student. Students can help other students with materials by upploading their notes and earn money.
We're available through e-mail, Twitter, Facebook, and live chat.
FAQ
Questions? Leave a message!
Copyright © Browsegrades · High quality services·