Education > EXAM > CDFM Module 4 Exam with Complete Solutions (All)

CDFM Module 4 Exam with Complete Solutions

Document Content and Description Below

What is JCIDS (Joint Capabilities Integration and Development System)? - ANSWER assesses gaps in military joint warfighting capabilities and recommends solutions to resolve these gaps Defense Acqui... sition System - ANSWER Process by which DoD acquires weapon systems and automated information systems What document provides entry into Milestone A the the Defense Acquisition System? - ANSWER Materiel Development Decision What are the two steps in pre-systems acquisition? - ANSWER Materiel solution analysis and technology development Which milestone is the program initiation? - ANSWER Milestone B The MDA may authorize entry into the acquistion system at any point? True or False - ANSWER True What are the most expensive programs? - ANSWER ACAT IA Who is the single point of accountability for accomplishing program objectives? - ANSWER program manager What says the DOD may not obligate funds for a major defense acquisition program after the program enters the Engineering and Manufacting phase? - ANSWER 10 USC 2435 What is systems engineering? - ANSWER overarching process that a program team applies to transition from a stated capability need to an operationally suitable system. It is the integrating mechanism across the technical efforts Program managers prepare a _________ for each milestone review, beginning with Milestone A. - ANSWER Systems Engineering Plan (SEP) Integrated Product and Process Development (IPPD) is - ANSWER mgmt technique that simultaneously integrates all essential acquisition activities through the use of multidisciplinary teams to optimize design, manufacturing and supportability processes. What are the 3 levels of IPT's - ANSWER Overachring Integrated Product Team (OIPT) that oversees entire program, Integrateing Integrated Product Team (IIPT), and Working Level Integrated Product Team (WIPT) that advise the PM What are the 8 technical management processes? - ANSWER 1. Decision Analysis 2. Technical Planning 3. Technical Assessment 4. Requirements Management 5. Risk Management 6. Configuration Management 7. Data Management 8. Interface Management What is decision analysis? - ANSWER provide the basis for evaluating and selecting alternatives SEP is a mandated tool for this activity - ANSWER Technical planning _______ measures technical progress and the effectiveness of plans and requirements - ANSWER technical assessment What maintains the traceability of all requirements from needs? - ANSWER requirements management _________ is an audit trail of decisions and design modifications - ANSWER configuration management What answers the question of "did you build it right"? - ANSWER verification What answers "is this the right solution"? - ANSWER validation What is a system of system engineering? - ANSWER satisfy capabilities thru multiple and interacting systems. Not to be confused with a "family of systems" What is the formal entry point into the acquisition process? - ANSWER Material Solution Analysis Phase What is not a decision point but opens the gate if all criteria has been met? - ANSWER MDA Which pases enters approved ICD and study guidance for conducting AOA and is guided by ICD and AOA plan? - ANSWER materiel solution analysis phase Which phase reduces technology risks, determine and mature the appropriate set of technologies to be integrated into a full system and to demonstrate critical technologies on prototypes? - ANSWER technology development phase The MDA for an MDAP, without the authority to delegate, shall sign a certification memorandum for record prio to ______________? - ANSWER Milestone A What follows the completion of technology development? - ANSWER Milestone B decision The purpose of the _____________ phase is to develop a system or an increment of capability; complete full system integration; develop an affordable and executable manufacturing process; ensure operational supportability with particular attention to minimizing the logistics footprint - ANSWER EMD (Engineering and Manufacturing Devlopment) Prior to beginning the ____________, users shall identify and the requirements authority shall approve a minimum set of key performance parameters (KPPs), included in the CDD, that guides the efforts of this phase. - ANSWER EMD EMD begins at _______________? - ANSWER Mileston B which is normally the initiation of an acquistion program At ______________, the MDA approves updated acquisition strategy and APB, entry into LRIP, exit criteria for LRIP if appropriate and an Acquisiton Decision Memorandum - ANSWER Milestone C What is the purpose of the production and deployment phase? - ANSWER achieve an operational capability that satisfies mission needs An MDAP may not proceed beyond LRIP without ___________? - ANSWER MDA approval What uses widely supported and consensus based standards for its key interfaces, and is subject to validation and verification tests to ensure the openness of its key interfaces? - ANSWER Open Systems Design What is commercial-off-the-shelf items (COTS)? - ANSWER maximum use of mature technology provides the greatest opportunity to hold fast to program cost, schedule, and performance requirements and is consistent with an evolutionary acquisition strategy Reliability, Availability and Maintainability (RAM) - ANSWER based on the initial capabilities document or capability development document and total ownership cost (TOC) considerations, and states them in quantifiable, operational terms, measurable during DT&E and OT&E 5000.01 requires the program manager to pursue _______ initiatives in order to optimize total system performance and minimize total ownership cost - ANSWER Human Systems Integration (HSI) The program manager should incorporate ______________ requirements into program design activities to ensure availability, integrity, authentication, confidentiality, and non-repudiation of critical system information - ANSWER information assurance What identifies and safeguards selected DoD research and technology anywhere in the RDT&E or acquisition process to include associated support systems - ANSWER Research and technology Protection (RTP) What is Item Unique Identification (IUID) - ANSWER identifies and tracks applicable major end items What should guide all technical aspects of an acquisition program? - ANSWER Systems Engineering Plan (SEP) When should a SEP be prepared? - ANSWER beginning with Milestone A What is an essential element of the systems engineering process? - ANSWER modeling and simulation Affordability assessments are typically conducted by _______________ in the DOD component headquarters or supporting organization - ANSWER resource analysts What balances cost versus performance in establishing key performance parameters? - ANSWER program affordability For MDAP and MAIS programs, affordability assessments are required at? - ANSWER Milestones B and C What is required as part of the entrance criteria for the transition into the EMD phase at Milestone B? - ANSWER full funding These are an example of what: set cost goals, perform trade-off studies, establish cost performance integrated product team, provide incentives and establish metrics - ANSWER CAIV (Cost as an independent variable) PM has no control over _______________ - ANSWER total ownership cost We need an ____________ at every major decision point - ANSWER AOA ___________ includes the total cost to the government of acquisition and ownership of that system over its useful liefe - ANSWER life-cycle cost The Milestone Decision Authority for an ACAT ID programs is: - ANSWER The Undersecretary of Defense (Acquisition, Technology and Logistics) The Design Readiness Review occurs during which phase of the Acquisition Process: - ANSWER System Development and Demonstration The Test and Evaluation Strategy is: - ANSWER An early T&E planning document [Show More]

Last updated: 1 year ago

Preview 1 out of 13 pages

Reviews( 0 )

$8.00

Add to cart

Instant download

Can't find what you want? Try our AI powered Search

OR

GET ASSIGNMENT HELP
52
0

Document information


Connected school, study & course


About the document


Uploaded On

Nov 19, 2022

Number of pages

13

Written in

Seller


seller-icon
CATE NATALIA

Member since 1 year

3 Documents Sold


Additional information

This document has been written for:

Uploaded

Nov 19, 2022

Downloads

 0

Views

 52

Document Keyword Tags

Recommended For You

What is Browsegrades

In Browsegrades, a student can earn by offering help to other student. Students can help other students with materials by upploading their notes and earn money.

We are here to help

We're available through e-mail, Twitter, Facebook, and live chat.
 FAQ
 Questions? Leave a message!

Follow us on
 Twitter

Copyright © Browsegrades · High quality services·