Accounting > A Level Question Paper > SAP S/4HANA Full List (TS410 Exam) (All)
TESTED AND CONFIRMED A+ ANSWERS What are the scope of a planning run? - CORRECT ANS -Regenerative Planning -Net Change for Total Horizon What is the purpose of Material Ledger? - CORRECT ANS -the ... elimination of locking and increase throughput for standard pricing for material valuation -improved and flexible valuation methods in multiple currencies and parallel accounting What is the output of an MRP run? - CORRECT ANS -Planned Order -Purchase Req for Dependent Requirements -Reservation for Dependent Items What is the master data need for Adv. Planning? - CORRECT ANS - Location - Product - Resource List the Options for Running MRP? - CORRECT ANS - Total Planning - Single Item Planning Multilevel - Single Item Planning Single Level - Single Item Planning Interactive What is the difference between the stock requirements list and the MRP list? - CORRECT ANS Stock Req - Real Time / Dynamic MRP List - Static / Frozen What is the difference between MRP and Consumption Based Planning? - CORRECT ANS MRP - planned on requirements (future, current, forecast) CBP - planning on historical data (historical) What does a work center control? - CORRECT ANS Standard Values Scheduling Capacity Costing Cost Center [Show More]
Last updated: 1 month ago
Preview 1 out of 29 pages
Instant download
Instant download
Connected school, study & course
About the document
Uploaded On
Apr 09, 2024
Number of pages
29
Written in
This document has been written for:
Uploaded
Apr 09, 2024
Downloads
0
Views
7
In Browsegrades, a student can earn by offering help to other student. Students can help other students with materials by upploading their notes and earn money.
We're available through e-mail, Twitter, Facebook, and live chat.
FAQ
Questions? Leave a message!
Copyright © Browsegrades · High quality services·