Management > QUESTIONS & ANSWERS > Defense Acquisition University PMT 252 252  Module 2 Exam Results (All)

Defense Acquisition University PMT 252 252  Module 2 Exam Results

Document Content and Description Below

Module 2 Exam • Here is your test result.The dots represent the choices you have made. • The highlighted questions are the questions you have missed. • Remediation Accessed shows whether you ... accessed those links.'N' represents links not visited and 'Y' represents visited links. Back to Status page contains 27 Questions 1) Which stage of the issue management (IM) process is characterized by the following scenario: After a higher-grade sealant was used to stop a screen fogging issue, the issue status was updated on the issue register, and will be tracked until the screen passes testing. [2.15.1 - Identify the components of the issue management process.] [Remediation Accessed :N] Issue monitoring Issue analysis Issue planning Issue corrective action 2) What would be the appropriate corrective action for the following issue: As part of your program, a major training exercise is scheduled to take place that includes the use of handheld radios to monitor the exercise itself. Five months before the training exercise, planners discover strong interference signals in the training area that prevent the radios from operating effectively. They looked at eliminating the risk by taking an alternate approach to replace the current radios and use different radios that achieve the same desired effect. [2.15.2 - Select the appropriate corrective action for high or moderate issues.] Avoid Ignore Control Transfer 3) Your expansion program for a base in a foreign territory has been periodically delayed due to protestors blocking the streets to prevent construction vehicles from entering the base. Based on the situation, a corrective action plan is in place, but construction is now at a standstill. What would be the most appropriate step to manage and track this issue? [2.15.3 - Given a scenario, identify the steps to track a resolution of issues against an issue corrective action plan.] Review the issue level and adjust the corrective action plan. Monitor the issue to collect only estimated cost information. Feed the information into future process steps. Update the issue infrequently at informal meetings. 4) During the Technology Maturation and Risk Reduction (TMRR) phase, the goal is to primarily reduce types of risk, including life cycle costs, engineering and which of the following? [2.16.1 - Identify Risk Management considerations during acquisition life cycle phases.] Integration Security Design Management 5) Which phase of the acquisition lifecycle would use proactive risk management activities to address risk associated with new requirements, follow-on increments, or deferred activities? [2.16.2 - Identify proactive risk management activities that support the acquisition life cycle phases.] Production and Deployment (P&D) Technology Maturation and Risk Reduction (TMRR) Engineering and Manufacturing Development (EMD) Materiel Solution Analysis (MSA) 6) Which of the following is the main difference between an opportunity and an issue? [2.2.1 - Identify the differences between risks, issues, and opportunities.] Issues can only have a negative impact on a project. Issues cannot be managed with as much precision as opportunities. Issues can be analyzed and tracked; opportunities cannot. Issues are resolved through resource reallocations; opportunities can only be addressed through innovation. 7) Which step of the Department of Defense (DoD) Risk Management Process provides an estimate of each risk’s likelihood and consequence? [2.3.1 - Identify the five steps of the DoD Risk Management Process] Analysis Identification Mitigation Monitoring 8) Which of the following is a critical success factor to ensure effective risk management (RM)? [2.4.1 - Given a scenario, identify the critical success factors to ensure effective risk management.] Risk management roles, responsibilities, and relationships Experienced program management Clearly detailing project requirements in the Request for Quotation (RFQ) Establishing priority risk categories 9) A program generally should have 3-5 framing assumptions. Which of the following is an attribute of a framing assumption? [2.5.2 - Choose appropriate examples of assumptions that are considered and assumed true.] •Consequences cannot be easily mitigated Does not significantly affect program expectations Is derivative of other assumptions Is generically applicable to all programs 10) Which of the following is an objective of risk process planning? [2.6.1 - Select risk process planning objectives.] Ensures sound risk management (RM) principles, tools, and techniques are applied to the RM program Answers only the question "why are these tools used to execute the RM process?" Describes the roles and responsibilities of all program personnel Ensures sound Earned Value Management (EVM) principles, tools, and techniques are applied to the RM program 11) Within a program at the management level, which of the following entities reviews the risks owned by the Integrated Product Teams (IPTs)? [2.6.2 - Identify typical potential program risk management organizational structures.] IPT Risk Management Board (RMB) Program Risk Management Board (RMB) Risk Owner Program manager (PM) 12) How should the government mitigate risk to ensure the most successful outcome? [2.6.3 - Explain the importance of government and contractor risk management.] Share risk responsibilities with the contractor. Transfer all or most risk responsibilities to the contractor. Assume most risk responsibilities, rather than transferring to the contractor. Manage the most critical risks and have the contractor manage less critical risks. 13) When should the Program Risk Process (PRP) Document be written? [2.6.4 - Using a scenario, apply specific content of a Program Risk Process (PRP) Document.] As soon as possible when starting a new project. Before reaching the first milestone. Before the Request for Proposal (RFP) is issued. Within the first 90 days following the kick-off meeting. 14) At the working level, which of the following is a responsibility of the Integrated Product Team (IPT) during the risk management (RM) process? [2.6.5 - Identify key elements of risk management as it relates to the role of IPT.] Identify the need for RM training for IPT personnel. Identify and submit candidate risks while supporting execution of the RM process. Determine whether new or updated risk analyses and mitigation plans are adequate. Review and validate identified program-level risks. 15) Which of the following sets of documents provides risk root causes for each phase of a program? [2.7.1 - Identify risk identification tools and methods.] Technical reviews Testing results Trend analyses Prototyping results 16) The following describes which type of category of risk: In an effort to stem cyberattacks aimed at Navy fighter jet communications and other essential systems, a new program is launched to reengineer the system integration to improve overall system security. If the initial reprogramming adjustments do not pass testing, the communication system will require a complete reprogramming effort, requiring an additional 1½ years to the schedule. [2.7.2 - Identify program risks and their associated root causes.] Technical Business Programmatic 17) The following describes which source of potential risk: The program development team uses an intranet to exchange documents between multiple centers. The Information Technology (IT) team reported that the system has received over 7,000 attempted security break-ins in the last two weeks alone. [2.8.1 - Identify typical risk sources in acquisition.] Security Management External Factors Requirements 18) It has been reported that fiscal policy changes may result in a 10% reduction (about $150,000) in funding for your program in the coming fiscal year. Your team estimates that there is a 40% chance that this reduction will be realized. Based on the likelihood and consequence table, what are the appropriate likelihood (L) and consequence (C) values? Level Probability of Occurrence Schedule Impact Cost Impact 1 >1% to ¡Ü20% Minimal or no schedule impact ( <5 days) <$20,000 2 >20% to ¡Ü40% Able to meet key dates (1 - 4 weeks) $20,000 - <$100,000 3 >40% to ¡Ü60% Minor schedule slip, able to meet key milestones (¡Ý4 weeks - 3 months) $100,000 - <$150,000 4 >60% to ¡Ü80% Significantly impacts ability to meet key milestones (¡Ý3 months - 4 months) $150,000 - <$200,000 5 >80% to ¡Ü99% Schedule slip requires major schedule rebaselining (>4 months) ¡Ý$200,000 [2.9.1 - Apply data provided in a risk report, including likelihood or probability criteria and consequences criteria.] L = 2; C = 4 L = 3; C = 3 L = 2; C = 5 L = 4; C = 4 19) The validity of a framing assumption (FA) is monitored by tracking which of the following? [2.5.1 - Identify the attributes that define the framing assumptions in an acquisition program.] Metrics, expectations, and implications during execution The number of risks and issues over the life of the program The number of high level risks identified The degree to which unexpected risks and issues surface during Milestone (MS) B 20) Which type of risk analysis has the highest chance of injecting bias into the risk identification process? [2.10.1 - Given a scenario, apply risk analysis tools and techniques for quantitative and qualitative analysis and assessment of risk levels.] Expert interviews Lessons learned Product Work Breakdown Structure (WBS) risk analysis Delphi Technique 21) Which of the following is presented with the resultant histogram of Monte Carlo simulations? [2.10.2 - Using a simulation, apply program schedule analysis.] [Remediation Accessed :N] Mean, or average, completion date of the project Final delivery dates for each task of the project Task durations for a specific part of the project based on comparisons with similar systems Final costs based on the completion date of the project 22) Based on the results of a simulation, there is an 80% chance that the project will end one week behind schedule. Using the table provided, what would the cumulative schedule risk be, based on a one calendar week schedule delay? Level Probability of Occurrence Schedule Impact 1 0% to 19% 0 to 5 days 2 20% to 39% 6 to 10 days 3 40% to 59% 11 to 15 days 4 60% to 79% 16 to 20 days 5 80% to 100% 21 to 25 days [2.10.3 - Identify program risk levels based on the results from simulations.] Probability 5; Schedule Impact 2 Probability 2; Schedule Impact 2 Probability 2; Schedule Impact 5 Probability 5; Schedule Impact 5 23) Your government program team is developing a new underwater helmet equipped with enhanced visualization technology. Condensation issues threaten the visibility of the screen and your team does not have the means to deal with the risk. You contract with a separate group of industry materials and mechanical engineers since they can better address that specific risk and offer a set of solutions back to you as you monitor their progress. This is an example of which mitigation strategy? [2.11.1 - Choose potential risk mitigation strategies as they relate to risk events.] Transfer Control Avoidance Acceptance 24) Your team is analyzing cost and schedule data performance to a baseline plan. Which monitoring tool would be most appropriate? [2.12.1 - Identify the various tools and techniques used in risk monitoring.] Earned value analysis Risk information form Management indicator system Technical performance measurements (TPMs) 25) What type of information can be gathered from a cost risk analysis (CRA)? [2.13.1 - Identify program management functions and tools that integrate with the Risk Management Process in support of a program.] Early estimations of cost overruns and the ability of the system to achieve the program’s life cycle cost objectives A summary of the final costs for the program at completion of the program's life cycle A list of cost overruns to date and indications of where cost savings can be made in future tasks A summary of cost trends derived from similar programs and an indicator of how those may translate into cost risks in the current program 26) Opportunities are which of the following? [2.14.1 - Identify the components of opportunity management and risk management.] Future benefits to a program's cost, schedule, and/or performance baseline, usually achieved through reallocation of resources Any future effects to a program's cost, schedule, and/or performance, usually achieved through adjustments to design and/or technical specifications Any future potential events that could affect the success of a program, usually identified through quantified cost and schedule analyses All future positive events in a program achieved by successful early design, planning, and coordination among program stakeholders 27) Your program, which has never managed more than two projects at a time, is scheduled to kick off five projects within a two-week period. This will require more rigid organizational, communication, and management skills to ensure success moving forward. Which of the following best describes this situation? [2.14.2 - Given a scenario, apply the differences between risk management and opportunity management.] It is only a risk. It is only an opportunity. It is neither risk nor opportunity. Need more information to determine if it is a risk or an opportunity. [Show More]

Last updated: 1 year ago

Preview 1 out of 9 pages

Reviews( 0 )

$9.00

Add to cart

Instant download

Can't find what you want? Try our AI powered Search

OR

GET ASSIGNMENT HELP
64
0

Document information


Connected school, study & course


About the document


Uploaded On

Sep 28, 2022

Number of pages

9

Written in

Seller


seller-icon
QuizMaster

Member since 4 years

1086 Documents Sold


Additional information

This document has been written for:

Uploaded

Sep 28, 2022

Downloads

 0

Views

 64

Document Keyword Tags

Recommended For You

What is Browsegrades

In Browsegrades, a student can earn by offering help to other student. Students can help other students with materials by upploading their notes and earn money.

We are here to help

We're available through e-mail, Twitter, Facebook, and live chat.
 FAQ
 Questions? Leave a message!

Follow us on
 Twitter

Copyright © Browsegrades · High quality services·