Military Science > QUESTIONS & ANSWERS > US Army Explosive Safety Familiarization Quiz 2022 with complete solution (All)
1. Your installation is refurbishing an existing PES facility built in 1968. Do you need to complete an ESSP?: Yes, and it requires DDESB approval. 2. As distance from the potential explosion site de... creases, the potential for damage to an exposed site from an explosion. increases. 3. Your installation is increasing the NEW for a storage site built in 1969 and storing a hazard division that was not previously approved for that location. Do you need to complete an ESSP?: Yes, and it requires DDESB approval. 4. Intraline distance (ILD) is the minimum distance permitted between. two operating buildings. 5. The purpose of an ESSP is to ensure safety, provide specifications, and...- : establish limits. 6. You must submit an ESSP for DDESB approval if the installation is. build- ing an ES within an existing ESQD arc. 7. Failing to submit a successful ESSP may result in...: reduced operational capacity. [Show More]
Last updated: 1 year ago
Preview 1 out of 2 pages
Connected school, study & course
About the document
Uploaded On
Oct 22, 2022
Number of pages
2
Written in
This document has been written for:
Uploaded
Oct 22, 2022
Downloads
0
Views
78
In Browsegrades, a student can earn by offering help to other student. Students can help other students with materials by upploading their notes and earn money.
We're available through e-mail, Twitter, Facebook, and live chat.
FAQ
Questions? Leave a message!
Copyright © Browsegrades · High quality services·