SCMG 202 Module 3 Exam, Part II Complete With Answers.1) Which is true about the Work Breakdown Structure (WBS)? The WBS cannot be used by contract personnel. The WBS is a tool that can help identif... y and assess technical risk. The WBS can be used to track key performance parameters against projected values as a system evolves over time. The WBS can be used to track contractor performance in terms of only cost against an established baseline. 2) As part of the life cycle product support and system engineering processes, ____________ is used to influence design and determine the most cost effective way to support the system. Technical Performance Measures Earned Value Management Product Support Analyses Parametric Cost Estimating 3) One of the benefits of using redundant back-up systems is: Increased transportability Increased number of parts Increased reliability Increased size and weight 4) When applying the systems engineering process to determine [Show More]
Last updated: 10 months ago
Preview 1 out of 6 pages
Connected school, study & course
About the document
Uploaded On
Jul 14, 2023
Number of pages
6
Written in
This document has been written for:
Uploaded
Jul 14, 2023
Downloads
0
Views
126
In Browsegrades, a student can earn by offering help to other student. Students can help other students with materials by upploading their notes and earn money.
We're available through e-mail, Twitter, Facebook, and live chat.
FAQ
Questions? Leave a message!
Copyright © Browsegrades · High quality services·