*NURSING > QUESTIONS & ANSWERS > CLE 003 Technical Reviews Exam 100% pass rate, (All)

CLE 003 Technical Reviews Exam 100% pass rate,

Document Content and Description Below

CLE 003 Technical Reviews Exam 100% 1. Technical reviews should be event driven not schedule driven with clear-cut entry and exit criteria 2. True False 11) As a best practice, who is responsible f... or tailoring IEEE Standard 15288.2 for Technical Reviews and Audits on Defense Programs and making available a data repository and how far in advance of the technical review are these tasks performed? 1. Which of the following statements is true?  The overarching reason for integrating technical reviews into the acquisition life cycle is to successfully complete the Operational Testing (OT) of the system under review.  The overarching reason for integrating technical reviews into the acquisition life cycle is to successfully complete Developmental Testing of the system under review.  The overarching reason for integrating technical reviews into the acquisition life cycle is to design, develop, and field systems that meet the contractual specifications and performance requirements of the warfighter.  The overarching reason for integrating technical reviews into the acquisition life cycle is to successfully complete Developmental Testing of the system under review 2. As best practice, who is responsible for tailoring IEEE Standard 15288.2 for Technical Reviews and Audits on Defense Programs and making available a data repository and how far in advance of the technical review are these tasks performed?  IPT Systems Engineer and IPT Logistician, no later than three months prior to the technical review.  Government Program Manager, no later than three months prior to the technical review.  Recorder, no later than three months prior to the technical review.  Government Program Manager, no later than two months prior to the technical review. 3. Which of the following will be assessed by the technical review board  Technical risks  Schedules, cost and performance risk  Technical risks  All of the items here will be assessed during each technical review  Technical design maturity This study source was downloaded by 100000823742721 from CourseHero.com on 05-26-2022 17:39:02 GMT -05:00 https://www.coursehero.com/file/56675247/CLE-003-Technical-Reviews-Exam-100docx/4. Which of the following statements is false ? Prior to the technical review, the technical review board chairperson directs the IPT systems engineer to complete all Request for Action forms to satisfy the technical review entry criteria.  The three critical deliverables resulting from each technical review are the completed Request for Actions forms, the updated Risk Assessment, and the recommendation to the Program Manager as to the technical readiness of the program to enter the next phase of development.  During the technical review, the tailored IEEE Standard 15288.2 for Technical Reviews and Audits on Defense Programs structure may be followed with each technical review board member responsible for evaluating his/her area of expertise.  No later than one month following the technical review, the technical review board chairperson, IPT Systems Engineer, and IPT Logistician 5. Which of the following statements is false ? Tailoring of the 15288.2 should be led by the Integrated Product Team (IPT) Systems Engineer and IPT Logistician  As a DoD adopted standard, the IEEE 15288.2 may be invoked by the government on an contract.  The IEEE 15288.2 can only be tailored by deleting criteria that does not apply to the system under development. Modification of criteria is not permitted.  The IEEE 15288.2 should be tailored by removing or modifying existing criteria and/or adding new criteria, as applicable, to reflect the specific nature of the program.  6. Technical reviews should be event driven, not schedule driven, with clear-cut entry and exit criteria.  True  False This study source was downloaded by 100000823742721 from CourseHero.com on 05-26-2022 17:39:02 GMT -05:00 https://www.coursehero.com/file/56675247/CLE-003-Technical-Reviews-Exam-100docx/7. Which of the following statements is true ? The System Verification Review (SVR) is conducted to ensure that the subsystem, system, or system under review is ready to proceed into formal test.  The Physical Configuration Audit (PCA) is conducted to ensure that the system under review can proceed into detailed design.  System Functional Review (SFR) is conducted to determine the current technology readiness level of selected system elements  Production Readiness Review (PRR) is an examination of the product to determine if the design is ready for production and the producer has accomplished adequate production planning 8. Which of the following is NOT a typical technical review exit criteria consideration that applies to most technical reviews?  Are all of the requirements for certification of readiness for the Operational Testing (OT) completed?  Are the risks known and manageable for design and development?  Is the program properly staffed?  Is the program executable within the program budget? 9. Which of the following is true?  Integrated Product Team (IPT) briefer may be invited to provide expert briefings of each of the relevant technical subjects to address during the technical review.  Independent subject matter experts (SMEs) are included only in the later technical reviews, starting with the Preliminary Design Review (PDR).  Government counsel, user representative, and development and operational testers must be include every technical review.  The program manager should always perform the role of Technical Review Board chairperson. 10. An agreed upon test configuration system, test plans, test cases, and test procedures are common entry criteria for which of the technical reviews?  Test Readiness Review (TRR)  Test Readiness Assessment (TRA)  This study source was downloaded by 100000823742721 from CourseHero.com on 05-26-2022 17:39:02 GMT -05:00 https://www.coursehero.com/file/56675247/CLE-003-Technical-Reviews-Exam-100docx/Preliminary Test Review (PTR)  Developmental Test Review (DTR) 11. Which of the following statements is true?  While the average amount of time the typical technical review lasts is two or three days, the duration varies widely based on the size and complexity of the program being reviewed.  Technical reviews are usually held at the prime contractor's facility.  It is recommended that each technical review be conducted one month before the program milestone or event it supports.  It is recommended that for large, complex programs, the subsys [Show More]

Last updated: 1 year ago

Preview 1 out of 7 pages

Add to cart

Instant download

We Accept:

We Accept
document-preview

Buy this document to get the full access instantly

Instant Download Access after purchase

Add to cart

Instant download

We Accept:

We Accept

Reviews( 0 )

$5.00

Add to cart

We Accept:

We Accept

Instant download

Can't find what you want? Try our AI powered Search

OR

REQUEST DOCUMENT
66
0

Document information


Connected school, study & course


About the document


Uploaded On

Aug 24, 2022

Number of pages

7

Written in

Seller


seller-icon
bundleHub Solution guider

Member since 2 years

314 Documents Sold


Additional information

This document has been written for:

Uploaded

Aug 24, 2022

Downloads

 0

Views

 66

Document Keyword Tags

More From bundleHub Solution guider

View all bundleHub Solution guider's documents »
What is Browsegrades

In Browsegrades, a student can earn by offering help to other student. Students can help other students with materials by upploading their notes and earn money.

We are here to help

We're available through e-mail, Twitter, Facebook, and live chat.
 FAQ
 Questions? Leave a message!

Follow us on
 Twitter

Copyright © Browsegrades · High quality services·