Management > QUESTIONS & ANSWERS > Answered Test - ACQ 202 Module 3 Exam: Part II Designing - Prototyping the System. Graded A+ (All)

Answered Test - ACQ 202 Module 3 Exam: Part II Designing - Prototyping the System. Graded A+

Document Content and Description Below

Answered Test - ACQ 202 Module 3 Exam: Part II Designing - Prototyping the System. Graded A+ In the process of conducting design considerations, a program's systems engineers are deciding from amon... g Components A, B, and C. All three components meet performance requirements. Component C has the highest initial cost; however, due to its superior reliability, it is projected to lead to lower life cycle costs than Components A and B in the long run, and this will help meet the program's affordability goals. This is adequate justification forthe team to select Component C. - ✔✔- *True* - False Which of the following supportability analysis tools relies on scheduled maintenance to spot a failure before it impacts system effectiveness? - ✔✔- Level of Repair Analysis (LORA) - Failure Modes, Effects and Criticality Analysis (FMECA) - *Reliability Centered Maintenance (RCM)* - Test, Analyze, Fix and Test (TAFT) In our decision matrix, Option 1 receives a "3" for reliability and a "2" for cost, and Option 2 receives a "1" for reliability and a "3" for cost. The reliability criterion has been assigned a weight of 0.4 and the cost criterion has been assigned a weight of 0.6. In accordance with the decision matrix approach, which of the following statements is true? - ✔✔- Option 2 is better than Option 1 because its total weighted score is lower. - Option 1 and Option 2 each score a total of 2.5, therefore, either choice is fine. - *Option 1 is better than Option 2 because its total weighted score is higher.* -Option 2 is better than Option 1 because its total weighted score is higher. Modeling and simulation can enhance the Systems Engineering process by: - ✔✔- Providing designs that will consistently exceed functional capabilities. - Eliminating technical risk before production begins. - *Helping IPT members to understand the interrelationship of components without physically changing the system.* - Quickly providing physical solutions to meet functional capabilities. In accordance with DoD acquisition policy and guidance, every program should consider, at a minimum, ______, human systems integration, reliability, availability, and maintainability. - ✔✔- *Open systems architecture* - Return on assets - Profit margin - Return on investment Which Systems Engineering tool would be used to describe the products to be developed under the terms of the contract? - ✔✔- *Work Breakdown Structure (WBS)* - Technical Performance Measurement (TPM) - Modeling and Simulation - Trade Study When making tradeoffs among competing features, what can be used to quantifiably compare alternatives by selecting, weighting, and applying criteria? - ✔✔- Parametric modeling - *Decision matrix* - Delphi technique - Least squares regression analysis During the Developmental Test (DT) effort, the purpose of verification is to determine ______. - ✔✔- Appropriate technical performance measures for a program - Solutions to any unplanned technical issues that may arise - *Whether or not the system meets its "build to" specifications* - The needed capabilities to reduce the program's technical risk What problem-solving process is used within an integrated Product and Process Development (IPPD) management process to provide a design that balances capability needs? - ✔✔- Technical Performance Measurement - Configuration Management [Show More]

Last updated: 1 year ago

Preview 1 out of 4 pages

Add to cart

Instant download

We Accept:

We Accept
document-preview

Buy this document to get the full access instantly

Instant Download Access after purchase

Add to cart

Instant download

We Accept:

We Accept

Also available in bundle (1)

ACQ DOCUMENT BUNDLE. LATEST UPDATES, GRADED A+

ALL ACQ BUNDLE, QUESTION WITH ACCURATE ANSWERS, PREDICTOR PAPERS

By bundleHub Solution guider 1 year ago

$39

31  

Reviews( 0 )

$7.00

Add to cart

We Accept:

We Accept

Instant download

Can't find what you want? Try our AI powered Search

OR

REQUEST DOCUMENT
88
0

Document information


Connected school, study & course


About the document


Uploaded On

Aug 24, 2022

Number of pages

4

Written in

Seller


seller-icon
bundleHub Solution guider

Member since 2 years

314 Documents Sold


Additional information

This document has been written for:

Uploaded

Aug 24, 2022

Downloads

 0

Views

 88

Document Keyword Tags

More From bundleHub Solution guider

View all bundleHub Solution guider's documents »
What is Browsegrades

In Browsegrades, a student can earn by offering help to other student. Students can help other students with materials by upploading their notes and earn money.

We are here to help

We're available through e-mail, Twitter, Facebook, and live chat.
 FAQ
 Questions? Leave a message!

Follow us on
 Twitter

Copyright © Browsegrades · High quality services·