ACQ Intermediate Systems Acquisition > QUESTIONS & ANSWERS > ACQ 202 Module 4 Exam: Part I Developing the System Q/A GRADED A (All)

ACQ 202 Module 4 Exam: Part I Developing the System Q/A GRADED A

Document Content and Description Below

A program manager should normally look for opportunities to integrate developmental testing (DT) and operational testing (OT) in order to save time and money. Correct Answer: -*True* -False Progr... am cost increases and schedules slips are most likely caused by __________________, changes to the design, and changes to the production processes. Correct Answer: -Changes to the number of systems ordered -Robust and accurate configuration management -Well-defined and documented technical data packages -*Changes to user capability needs* An Early Operational Assessment is typically conducted to _____________________. Correct Answer: -Support the decision to begin low rate initial production (LRIP) -Meet the requirement to conduct initial operational test and evaluation (IOT&E) -Track the evolution of critical technical parameters against the system design -*Identify potential operational effectiveness and suitability issues during system development* The management of internal interface design would usually be the responsibility of the _____________? Correct Answer: -Independent Test and Evaluation Agency -Joint Interoperability Test Command -Government Program Manager -*Contractor* The Program Manager just received approval of his proposed acquisition strategy with one exception: he has been directed to make maximum use of existing Air Force software. Which of the best software acquisition practices is most applicable to his situation? Correct Answer: -Use metrics to manage -Use system based software design -*Assess reuse risks and cost* -Inspect requirements and design When a program deviation occurs, the Program Manager should notify the Milestone Decision Authority within 90 days of the occurrence. Correct Answer: -True -*False* The below-threshold maximum amount of Research, Development, Test, and Evaluation (RDT&E) funds that can be moved into a program element is __________. Correct Answer: -$5 million -$15 million [Show More]

Last updated: 1 year ago

Preview 1 out of 4 pages

Add to cart

Instant download

Reviews( 0 )

$7.00

Add to cart

Instant download

Can't find what you want? Try our AI powered Search

OR

REQUEST DOCUMENT
30
0

Document information


Connected school, study & course


About the document


Uploaded On

Aug 27, 2022

Number of pages

4

Written in

Seller


seller-icon
Tenhang

Member since 1 year

12 Documents Sold


Additional information

This document has been written for:

Uploaded

Aug 27, 2022

Downloads

 0

Views

 30

Document Keyword Tags

What is Browsegrades

In Browsegrades, a student can earn by offering help to other student. Students can help other students with materials by upploading their notes and earn money.

We are here to help

We're available through e-mail, Twitter, Facebook, and live chat.
 FAQ
 Questions? Leave a message!

Follow us on
 Twitter

Copyright © Browsegrades · High quality services·