Social Sciences > QUESTIONS & ANSWERS > ACQ 101 Module 13 Life Cycle Logistics (2022/2023) Already Passed (All)

ACQ 101 Module 13 Life Cycle Logistics (2022/2023) Already Passed

Document Content and Description Below

ACQ 101 Module 13 Life Cycle Logistics (2022/2023) Already Passed Which of the following are encompassed in life cycle management? ✔✔single-point accountability; development and implementation ... of a product support strategy; document the strategy in the LCSP; perform continuing and regular reviews The life cycle sustainment plan LCSP describes which of the following? ✔✔the approach to integrating sustainment requirements into the system's design; sustainment influences; required technical, business, and management activities. During which life cycle phase does a PM have the most influence on the cost of a system? ✔✔materiel solutions analysis The product support business model PSBM was developed to assist the PM and PSM, who must be tightly aligned, with the numerous supportability consideration and trade-offs that take place during the development and fielding of a weapon system. ✔✔true The objective of product support is to execute a sustainment strategy that delivers affordable readiness, defined as providing mission capability to the warfighter at a reduced cost to the taxpayer. ✔✔true What step in the produce support strategy process model involves engineering and supportability data? ✔✔baseline the system What step in the product support strategy process model involves a clear analysis of the advantages of the product support alternatives? ✔✔product support value analysis Product support analysis is conducted only at the system and component levels? ✔✔false, it can be conducted at the system, subsystem or component level Reliability answers which of the following questions? ✔✔How long will a system continuously work? Maintainability answers which of the following questions? ✔✔How long does it take to repair a system? Availability answers which of the following questions? ✔✔Is the system on hand and ready to perform when needed? What are the major elements that impact a system's ability to perform its mission? ✔✔design effectiveness; technical effectiveness; mission effectiveness Why is the affordable system operational effectiveness concept important? ✔✔it provides a framework for developing system performance and supportability; it is what the user sees in terms of how well the system is able to perform its missions over a sustained period Technical performance is realized through designed-in system functions and their corresponding capabilities. In this context, functions refer to the desired mission abilities the system should be capable of executing in the operational environment? ✔✔true; functions refer to the desired mission abilities the system should be capable of executing in the operational environment The focus of MSA phase is on identifying final plans and any critical product support capability requirements. ✔✔false, the focus of MSA phase is on identifying the initial concept and any critical product support capability requirements. During the production and deployment phase what is emphasized? ✔✔managing and deploying the initial sustainment capabilities; finalizing equipment product support packages and maintenance plans; demonstrating the product support capabilities and effectiveness. How many IPS elements are there? ✔✔12 The objective of the product support management IPS element is to plan and manage cost and performance across the product support value chain, from design through disposal? ✔✔true Which of the following will the product support management IPS element provide through the product support manager PSM? ✔✔review of product support arrangements between the integrators and providers; comprehensive product support strategy for the weapon system; appropriate cost analyses to validate the product support strategy. Proper supply support management results in having all the right spares, repair parts, and all classes of supplies available, in the right quantities at the right place, at the right time at the right price? ✔✔true Maintenance planning and management establishes maintenance concepts and requirements for the life of the system for both hardware and software? ✔✔true Which of the following items are included on the list of basic items that need to be considered as part of design interface? ✔✔safety requirements; affordability; anti-tamper; habitability Which of the following does sustaining engineering in operational environments include? ✔✔evaluation of the potential for deficiency correction; development of a range of corrective action options; determination of the relative costs and risks associated with implementation of various corrective action options; associated root cause analyses Computer resources include manpower, personnel, hardware, software, and documentation such as licenses and services? ✔✔true Facilities and infrastructure consist of only permanent real property assets and infrastructure required to support a system? ✔✔false The terms manpower and personnel are interchangeable? ✔✔false Requirements for support equipment ensure that the system is available to the warfighter when it is needed at any cost? ✔✔false, when it is needed at the lowest total ownership cost TOC. Training is the learning process by which personnel acquires or enhances predetermined jobrelevant knowledge, skills, and abilities by developing which of the following? ✔✔physical; cognitive; sensory abilities Support equipment, spare parts, and operators and maintenance personnel are examples of: ✔✔life cycle costs Which of the following integrated product support IPS element objective is "to plan and manage cost and performance across the product support value chain, from design through disposal"? ✔✔product support management Which of the following is a goal of supportability analyses? ✔✔ensure that supportability is included as a system performance requirement What is mean time to repair MTTR used to measure? ✔✔maintainability What do acquisition logisticians do? ✔✔make sure that the necessary support structure is in place when the system is fielded Which of the following integrated product support IPS element involves the identification and acquisition of personnel with the skills and grades required to operate, maintain, and support systems over their lifetime? ✔✔manpower and personnel Which of the following integrated product support IPS element involves the identification, review, assessment, and resolution of deficiencies throughout a system's life cycle? ✔✔sustaining engineering Which of the following refer to reliability? ✔✔the probability that an item can perform its intended function for a specified interval under the stated conditions Which of the following Integrated Product Support (IPS) Element objective is "to plan and manage cost and performance across the product support value chain, from design through disposal"? ✔✔product support management Which of the following are strategies of life cycle sustainment? ✔✔comprehensive and early planning, development, and implementation The Product Support Business Model (PSBM) was developed to assist the PM and PSM, who must be tightly aligned, with the numerous supportability considerations and trade-offs that take place during the development and fielding of a weapon system. ✔✔true Life cycle logistics is defined as the planning, development, implementation, and management of comprehensive, affordable, and effective systems support strategies. ✔✔true Why is the concept of affordable system operational effectiveness important? ✔✔it enables the user to see how well the system is able to perform its missions over a sustained period Logisticians and engineers who perform sustainment analyses should have a basic understanding of Operations, System missions and profiles and the system capabilities? ✔✔true What is the primary life cycle sustainment objective of the Engineering and Manufacturing Development (EMD) phase? ✔✔developing the requirements for the long-term performance based support concepts Life cycle costs consist of research and development costs, investment costs, operating and support costs, and disposal costs over the entire life cycle. ✔✔true Which two measurement elements combine to form availability, the most common measure of system effectiveness? ✔✔reliability and maintainability [Show More]

Last updated: 1 year ago

Preview 1 out of 9 pages

Add to cart

Instant download

We Accept:

We Accept
document-preview

Buy this document to get the full access instantly

Instant Download Access after purchase

Add to cart

Instant download

We Accept:

We Accept

Also available in bundle (1)

ACQ 101 BUNDLED EXAMS QUESTIONS AND ANSWERS (2022/2023) WITH VERIFIED SOLUTIONS

ACQ 101 BUNDLED EXAMS QUESTIONS AND ANSWERS (2022/2023) WITH VERIFIED SOLUTIONS

By Nutmegs 1 year ago

$25

23  

Reviews( 0 )

$10.00

Add to cart

We Accept:

We Accept

Instant download

Can't find what you want? Try our AI powered Search

OR

REQUEST DOCUMENT
61
0

Document information


Connected school, study & course


About the document


Uploaded On

Apr 23, 2023

Number of pages

9

Written in

Seller


seller-icon
Nutmegs

Member since 3 years

578 Documents Sold


Additional information

This document has been written for:

Uploaded

Apr 23, 2023

Downloads

 0

Views

 61

Document Keyword Tags


$10.00
What is Browsegrades

In Browsegrades, a student can earn by offering help to other student. Students can help other students with materials by upploading their notes and earn money.

We are here to help

We're available through e-mail, Twitter, Facebook, and live chat.
 FAQ
 Questions? Leave a message!

Follow us on
 Twitter

Copyright © Browsegrades · High quality services·