Social Sciences > QUESTIONS & ANSWERS > TIM TRAINING - Termination Test (All)

TIM TRAINING - Termination Test

Document Content and Description Below

TIM TRAINING - Termination Test 1. What is the last task in the termination phase of a roadway incident? A) Terminating command B) Removal of traffic control and blocking vehicles C) Ensuring that... all incident documentation is complete D) Confirming that all personnel and equipment are accounted for - ✔✔B) Removal of traffic control and blocking vehicles What is typically the next step after the immediate emergency response phase, such as patient care or vehicle fire extinguishment, has concluded? A) Terminate command B) Create a termination plan C) Stow fire, rescue, and EMS equipment D) Perform a personnel accountability check - ✔✔B) Create a termination plan Which one of the following is not part of the roadway incident termination plan? A) Removal of detours B) Repair of the roadway C) Incident documentation D) Notification of the Traffic Management Center - ✔✔C) Incident documentation ***NOT SURE+++ Once all tasks are complete and you are ready to reopen the road or lane, you may dismantle the scene. What is the correct manner in which to accomplish this task? A) From the Advance Warning Area forward to the Activity Area B) From the Termination Area backward to the Activity Area C) From the Termination Area forward to the Advance Warning Area D) From the Termination Area backward to the Advance Warning Area - ✔✔D) From the Termination Area backward to the Advance Warning Area Deploy emergency vehicles __________ as advance warning and blocking when temporary traffic control devices are being removed and/or when equipment is being demobilized. A) special B) parallel C) upstream D) downstream - ✔✔C) upstream What is the first key to smooth roadway operations involving towing and recovery? A) Conduct joint training B) Preplan prior to the incident C) Make a timely call for the towing company and provide accurate information D) Know and adhere to the regulations and SOPs with regard to removal and towing and recovery - ✔✔zxc Make a timely call for the towing company and provide accurate information. Although you should know the TRAA Vehicle Identification Guide and use proper terminology, resist the urge to: A) maintain blocking functions B) stow firefighting tools and equipment C) remove small debris from the roadway D) specify the type of towing response vehicle needed - ✔✔D) specify the type of towing response vehicle needed How should the vehicles remaining at the roadway incident scene depart once traffic control removal has been completed? A) Depart at same time B) Depart upstream first, if possible C) Depart in the same order that they arrived D) Depart downstream first, if possible - ✔✔D) Depart downstream first, if possible What is the last thing that should be done at a roadway incident scene? Write the incident report B) Towing and recovery C) Perform a critique of the operation D) Remove all damaged vehicles from the roadway - ✔✔zxc Whose role is to remove vehicles involved in the incident quickly and safely so the roadway can be reopened as soon as possible? A) Law enforcement B) Towing and recovery C) Incident commander D) Highway department - ✔✔B) Towing and recovery Safe, quick clearance of highway emergency scenes is a cornerstone of the: - ✔✔"National Unified Goal for Traffic Incident Management". What policy or system gives designated public agencies permission to remove vehicles and/or spilled cargo from the roadway to restore traffic flow? - ✔✔An Authority Removal Law To help clear the scene of a fatality collision more quickly, determine whether an SOP can be created in cooperation with the _______________ to allow the vehicle containing the body to be removed to an off-site location for extrication. - ✔✔medical examiner [Show More]

Last updated: 1 year ago

Preview 1 out of 5 pages

Add to cart

Instant download

We Accept:

We Accept
document-preview

Buy this document to get the full access instantly

Instant Download Access after purchase

Add to cart

Instant download

We Accept:

We Accept

Reviews( 0 )

$8.50

Add to cart

We Accept:

We Accept

Instant download

Can't find what you want? Try our AI powered Search

OR

REQUEST DOCUMENT
99
0

Document information


Connected school, study & course


About the document


Uploaded On

May 17, 2023

Number of pages

5

Written in

Seller


seller-icon
Nutmegs

Member since 3 years

578 Documents Sold


Additional information

This document has been written for:

Uploaded

May 17, 2023

Downloads

 0

Views

 99

Document Keyword Tags

What is Browsegrades

In Browsegrades, a student can earn by offering help to other student. Students can help other students with materials by upploading their notes and earn money.

We are here to help

We're available through e-mail, Twitter, Facebook, and live chat.
 FAQ
 Questions? Leave a message!

Follow us on
 Twitter

Copyright © Browsegrades · High quality services·