Electrical Engineering > QUESTIONS & ANSWERS > NERC text questions and answers with approved solutions (All)
NERC text questions and answers with approved solutions Operating reserve may be provided by which of the following? A. LTCs B. Capacitor banks C. Voltage regulators D. Interruptible loads ✔�... �D. Interruptible loads Which of the following is the responsibility of a reserve sharing group (RSG)? A. Complying with DCS as if it was a single control area B. Proving regulation service for neighboring RSGs C. Ensuring each control area in the group maintains 50% blackstart capability D. Complying with the control performance standards as if it was a single control area ✔✔A. Complying with DCS as if it was a single control area Generation is not sufficient to meet load, the control area is importing heavily, and voltage is decaying, which of the following actions should be taken by the operator? A. Shed load B. Correct schedule deviation C. Use the Interconnection Hotline D. Schedule interchange transaction ✔✔A. Shed load What measures power flow data between control areas? A. OASIS B. Interchange C. Transactions D. Tie-Line metering ✔✔D. Tie-Line metering Transmission line removal as a voltage control can be used if: A. Loop flow remains high B. Reactive equipment is available C. Reliability stays at acceptable levels D. Synchronous condensers are off the line ✔✔C. Reliability stays at acceptable levels Control Area A is generating and sending Control Area B a schedule. Both control areas should verify all of the following EXCEPT: A. Magnitude (MW) B. Ramp rate C. Price D. Start/stop times ✔✔C. Price The AGC control mode that is normally used for system operation is: A. Flat Tie Mode B. Flat Frequency Mode C. Frequency Bias Mode D. Tie Line Bias Mode ✔✔D. Tie Line Bias Mode There has been a wide-area disturbance. The transfers through the system have increased and there is a possibility that loss of one major tie line would cause corresponding loading and voltage deviations. Having system resources available, the security coordinator should: A. Increase generation to reduce flows across the ties B. Implement schedule changes across the hour C. Implement a voltage reduction plan D. Advise the supervisor ✔✔A. Increase generation to reduce flows across the ties When referring to transmission lines of an interconnected network, neighboring systems should use: A. Own line identifiers and ratings B. NERC line identifiers and ratings C. Region line identifiers and ratings D. Uniform (common) line identifiers and ratings ✔✔D. Uniform (common) line identifiers and ratings To what level should a control area maintain its own reactive reserves? A. 105% voltage level B. 95% voltage level C. First contingency conditions D. Second contingency conditions ✔✔C. First contingency conditions Which load shedding step should b [Show More]
Last updated: 1 year ago
Preview 1 out of 52 pages
Instant download
Buy this document to get the full access instantly
Instant Download Access after purchase
Add to cartInstant download
NERC BUNDLED EXAMS QUESTIONS AND ANSWERS WITH VERIFIED SOLUTIONS
By Nutmegs 1 year ago
$16
9
Connected school, study & course
About the document
Uploaded On
Jan 14, 2023
Number of pages
52
Written in
This document has been written for:
Uploaded
Jan 14, 2023
Downloads
0
Views
72
In Browsegrades, a student can earn by offering help to other student. Students can help other students with materials by upploading their notes and earn money.
We're available through e-mail, Twitter, Facebook, and live chat.
FAQ
Questions? Leave a message!
Copyright © Browsegrades · High quality services·